ASTM D3689-90 PDF

Axial Tensile Pile Load Testing. ASTM D – 07 (per ICC-ES AC). 1. Load Decrement %Ultimate Load. 1. 2. 3. 4. 5. 0. Tension Pile Load Test. The test shall conform to the ASTM D ( Reapproved ) “Standard Test. Method for Individual Piles Under Static Axial Tensile. What are the most common ASTM’s utilized for pile load testing? Tensile or Tension Load Testing – ASTM D Standard Test Method for Individual.

Author: Kajira Negis
Country: Serbia
Language: English (Spanish)
Genre: History
Published (Last): 26 December 2007
Pages: 195
PDF File Size: 6.98 Mb
ePub File Size: 19.35 Mb
ISBN: 385-1-44462-594-6
Downloads: 21369
Price: Free* [*Free Regsitration Required]
Uploader: Yokus

Thank you for visiting our website and your interest in our free products and services.

Art Design Architecture Photos. Magazine Social Media Sports Travel. If two or more reactionpiles are used at each end of the test beam sthey shall becapped with a suitable steel beam s set on steel bearing platesor directly on and welded to steel reaction piles Fig.

Aetm you have any questions about copyright issues, please d369-90 us to resolve them. Last previous edition D — Notes and illustrations includedherein are explanatory or advisory. Imperative sentencesindicate mandatory provisions.

We are always happy to assist you. This test method is applicable to alldeep foundation units that function in a manner similar to piles,regardless of d3689-09 method of installation. We are nonprofit website to share and download documents. Aftercalibration, load cells shall not be subjected to impact loads.

A Monte-Carlo method for portfolio optimization under partially observed stochastic volatility. To the running of this website, we need your help to support us. Calibration of load zstm shall include eccentricloading of 1: Asuperscript epsilon e indicates an editorial change since the last revision or reapproval. N OTE 1—When a pile group is subject to vertical test loads, caprotations and horizontal displacements may occur.

  INTRODUCTION TO PHENOMENOLOGY SOKOLOWSKI PDF

The test pile s shall be cut off or built up to theproper grade as necessary to permit construction of theload-application apparatus, placement of the necessary testingand instrumentation equipment, and observations of the instru-mentation.

List of Shortlisted Ph. N OTE 4—Unless the hydraulic jack pump is attended at all times, it isrecommended that the jacking system be equipped with an automaticregulator to hold the load constant as pile movement occurs. Bearing plates shall beset perpendicular to the longitudinal axis of the pile. Apparatus for Applying Loads 4. A number in parentheses indicates the year of last reapproval.

All materials on our website are shared by users. Bearing plates on cribbing shall be set in a horizontalplane. Current edition approved May 25, If two or more jacksare to be used to apply the test load, they shall be of the sameram diameter, connected to a common manifold and pressuregage, and operated by a single hydraulic pump.

Pile Load Testing | Common ASTMs

Please download to get full document. On-line solids hold-up measurement in mineral slurries by the standard addition method.

N OTE 3—Plate not required for steel reaction pile. It does not cover the interpretationor analysis of the test results or the application of the testresults to foundation design.

N OTE 5—Considerations should be given to employing a dual load-measuring system pressure gage and load cell to provide as a check andas a backup in case one system malfunctions.

N OTE 2—Use same type reaction piles or cribbing at both ends of test beam.

All Category Directory TagCloud. N OTE 2—If it is not feasible to apply axial test loads to a batter pile, theresults of a test on a similar nearby vertical pile generally may be used toevaluate the uplift capacity of the batter pile. Factors such as type d368-90 depth of reaction, soilconditions, and magnitude of loads should be considered. The occurrence of suchhorizontal movements, and the necessary reactions to resist such move-ments if they are to be prohibited, should be considered when designingand constructing the load apparatus for the group test.

  CALLEJON SIN SALIDA GEMMA LIENAS PDF

The provisionspermit the introduction of more detailed requirements and procedures, when required to satisfy theobjectives of the test program. This test method isdivided into the following sections: The hydraulic jack s shall be calibrated over its complete range of ram travel forincreasing and decreasing applied loads. Support the ends of the test beam s withreaction piles or cribbing. If two or more reaction piles are usedat each end of the test beam sthey shall be capped with asuitable steel beam s set on the piles d689-90 on bearing plates Fig.

Whentesting a batter pile, reaction piles shall be battered in the samedirection and angle as the test pile; the test beam s shall beperpendicular to the direction of batter.

Frequently Asked Questions

Standard Test Method for. Technology Science Software Engineering. While the procedures herein produce a relationship between appliedload and pile movement, the results may not represent long-term performance. We Need Your Support. The method in 4. Cribbing, if used as a reaction, shall be of sufficientplan dimensions to transfer the reaction loads to the soilwithout settling at a rate that would prevent maintaining theapplied loads.

Bearing plates that supporttest beam s on timber cribbing shall have a side dimension notless asgm 1 ft 0. Originallypublished as D —

Back to top